…and reconstruction 16 km highway A16

train_1
Function: designer
Disciplines: infrastructure, geotechnics, water, temporary emergency roads

Project:
Total reconstruction of 16 km of highway and secondary infrastructure parallel to High Speed Train Amsterdam-Paris. I have worked as a designer in a co-operating team of contractor firms. These contractors formed a temporary “design and construct” organization.

Responsibilities:

train_2– Visualizing spatial interfaces between different disciplines
– Designing and detailing infrastructure (roads, ground)
– Material calculations
– Designing and detailing water
– Eco- and water culvert design
– Design emergency roads in temporary infrastructure